Proiecte Energie România

Proiecte fotovoltaice mari

Nr.
Project
MWp
BESS (MWh)
PV Park
Permit
Grid Connection
Permit
RTB
1
36
Obținut
Obținut
Q2 2025
2
Corbu, OT
46.41
Q2 2025
CTE
Q3 2025
3
Corbu 1, OT
45.5
Q2 2025
CTE
Q3 2025
4
Corbu 2, OT
22.4
Q2 2025
CTE
Q3 2025
5
31.5
Q2 2025
CTE
Q3 2025
6
43.8
Q2 2025
Q2 2025
Q3 2025
7
24.5
Q2 2025
Q2 2025
Q3 2025
8
25
100
Q3 2025
Q2 2025
Q3 2025
9
45
180
Q3 2025
Q2 2025
Q3 2025
10
Saligny, CT
42.7
170.8
Q3 2025
Q2 2025
Q3 2025

Total: 362.81 MWp | 450.8 MWh BESS

Proiecte fotovoltaice mici/medii

Nr.
Project
MWp
BESS (MWh)
PV Park
Permit
Grid Connection
Permit
RTB
1
Borod, BH
1.3
2.5
Obtained
Obtained
Q2 2025
2
Cuzaplac, SJ
5
10
Q2 2025
CTE
Q2 2025
3
Salatig, SJ
1.4
3
Q2 2025
CTE
Q3 2025
4
Targu Lapus, MM
3.8
8
Q2 2025
Obtained
Q2 2025
5
Damis, BH
1.1
2
Obtained
Obtained
Q2 2025
6
Diosig, BH
4
8
Q2 2025
Q2 2025
Q3 2025
7
Cuza Voda, CT
12
Q2 2025
Q2 2025
Q3 2025
8
Criseni, SJ
3.5
2
Q2 2025
Obtained
Q3 2025
9
Criseni, SJ
4.5
10
Q2 2025
Q2 2025
Q2 2025
10
Medgidia, CT
7.5
Q2 2025
Q2 2025
Q2 2025
11
Medgidia, CT
1.8
Q2 2025
Q2 2025
Q3 2025
12
Cristesti, BT
0.9
2
Obtained
Obtained
Obtained
13
Cristesti, BT
0.9
2
Obtained
Obtained
Obtained
14
Dalga, CL
0.9
2
Obtained
Obtained
Obtained

Total: 48.6 MWp | 51.5 MWh BESS

Stocare BESS Stand Alone

Nr.
Project
BESS (MWh)
PV Park
Permit
Grid Connection
Permit
RTB
1
370
Q2 2025
Q2 2025
Q3 2025
2
115
Q2 2025
Q2 2025
Q3 2025
3
Cujmir, MH
115
Q2 2025
Q2 2025
Q3 2025
4
300
Q2 2025
Q2 2025
Q3 2025
5
Otopeni, IF
153.6
Q2 2025
Q2 2025
Q3 2025
6
Fundulea, CL
40
Q3 2025
Q3 2025
Q3 2025

Total: 1093.6 MWh BESS